User company : Branch 6 Refinery

  1. Temperature seitch insstallation of inland crude unloading facilities at rail car loading terminal connection and wiring test
  2. PR Service Install Cable tray FAR60 Cable tray and support
  3. Tubing Installation for Heavy Gas Project at Refinery Install. Tubing and pressure test
  4. Service for Install pre-condition kit PTTGC6 refinery Install. Air condition and test
  5. Cable Puling and Termination Work at Sub#1 for Heavy Gas Project termination and test
  6. Cable Puling and Termination Work at Sub#3 for Heavy Gas Project Termination and test
  7. Service for Electrical Installation, PTTGC6 Refinery work chase 60 days termination and test
  8. Service for Underground cable for IRP632,PTTGC6 Install. Panel connection and test pump

User company : Branch 5 Aromatic II Plant

  1. Sevice cover protection flow comp. ptt gc5
  2. Installation instrument & analyzer connection and test
  3. Instrument work for comparably Installation for supporting 2100-E14 install. TE , PT
  4. Service for installation led monitor & power supply pic15a,b at pttgc5

User company : Branch 7 Jetty and Buffer Tank Farm

  1. Service for Change Level tank gauge LI812D

User company : Branch 8 Aromatics Tank Farm

  1. Service for Install foundation & cable tray Fire pump Cables and wiring

User company : Branch 11 Olefins Plant 3

  1. Rewiring neutral connector