Work Valume 2017

Work Experience 2017

User company : Branch 4 Aromatics I Plant

  1. Instrument work for Hot condensate by pass pttgg4 Install. Stanchion, pulling cable ,terst
  2. 200-C2B_Service for installation Drain tube for GC4 , Install. Tube , pressure test,steel support
  3. Service for insrall moisture with cabinet for GC4 Install.stanchion ,Junction box,connection, test
  4. Service for Installation network cable lan com200 for GC4-Aromatics 1 pulling cable , connection , test cables
  5. Instrument work for Hot condensate by pass pttgg4
  6. 930-XC-5_Service install cable tray for GC4 - Plant 1
  7. Service for insrall moisture with cabinet for GC4
  8. Instrument Construction, URIP Improve Steam Reliability Project
  9. Cable Lan CAT6_Service for installation cable lan for GC4 - Aromatics 1 Plant
  10. 110EA-1A_Service for pulling power cable for GC4 Pulling cable , excavation , test

User company : Branch 6 Refinery

  1. Service for installation valve limit switch of gasoil PTTGC6 ,Install. Steel support , cable connection , test
  2. CCTV Installation Work, Packinox project at pttgc6 Refinery plant ,Excavation, pulling cable , install. Junction, stanchion
  3. Instrument Construction for LLOD-N and LLOD-S, Refinery Storm water Improvement
  4. Instrument Construction for Rail Truck Loading (RTL.) Refinery storm water Improvement
  5. Service for Instrument installation for LPG interconnecting Refinery plant
  6. Service for installation vale limit switch of LPG ,Refinery plant
  7. Electrical construction for RTL area,Refinery storm water Improvement project
  8. Service for Installation Pressure Transmitter at Unit 1750 Area, PTTGC6
  9. Service for Modify Drainage Line of Sampling System, PTTGC6
  10. Service for Installation Wireless Repeater at PTTGC6
  11. Service for Installation Cable for Flow Transmitter K-1701A/B/S at PTTGC6
  12. CCTV Installation Work, Packinox project at pttgc6 Refinery plant ,Excavation, pulling cable , install. Junction, stanchion

User company : Branch 5 Aromatic II Plant

  1. ETP Electrical & Instrument Installation Desalter Project at PTTGC5 install.stanchion , cable tray , connection ,test
  2. Service for additional work for ETP Electrical & Instrument installation for Desalter-Aromatics II install.stanchion , cable tray , connection ,test
  3. Service for installation CCTV Tower truck loading PTTGC5 ,Excavation , junction box , pole stanchion
  4. 2200-V7, 2940-V3 & 2200-C1 Service for installation staeam flow tranmitter for GC5 install.stanchion , cable tray , tubing, install. equipment, connection ,test
  5. Service for addlitional work for etp electrical & installation for desalter-aromtics ll install.stanchion , cable tray , install. equipment, connection ,test
  6. Service for intallation skin Temp transmitter in 2100-H1 E9 Outlet at PTTGC5 install. Equipment , cable tray , cable pulling , connection, test
  7. Instrument Construction for Desalter & E TP project at pttgc5 install. Equipment , cable tray , cable pulling , connection, test
  8. Service for control valve installation at PSA install. Equipment , cable tray , cable pulling , connection, test
  9. 2200-V7, 2940-V3 & 2200-C1 Service for installation staeam flow tranmitter for GC5
  10. Service for temp transmitter installation 2150-E1A, PTTGC5
  11. Service for Installation CCTV Tower Truck
  12. Service Install air condition for analyzer house unit 2540 for GC-5 Aromatics 2 Plant
  13. CCTV System modification at PTTGC5 TRUCK LOADING
  14. Service for installation fiber optic cable MM Truck loading area at PTTGC5
  15. Service for insallation instrument work LPG interconecting line project PTTGC5
  16. Service for Install skin Temp sensor in 2100-H1 at PTTGC5
  17. Service for Installation Flow Transmitte 2100-FT-040 at PTTGC5
  18. Electrical Modification, Desalter Projec at PTTGC5 PR REFERENCE NO 9930116611 18.1) Electrical Modification, Desalter Projec at PTTGC5 PR REFERENCE NO 9930116612
  19. RCU Re-WIRING Local conrrol unit55 set 2.indirect cost,safety5days,supervisor5days
  20. Service for new COD anslyzer 940-XC1
  21. Install alarm bell for GC5
  22. Service for temp transmitter installation 2150-E1A, PTTGC5 install. Equipment , cable tray , cable pulling , connection, test

User company : TOC Glycol

  1. Service remov & reinstatement work for instrument, remove equipment, connection, test
  2. Service for E&I for D-222 TOCGC PLANT instrument, remove equipment, connection, test
  3. Service E & I work ( CHEMICAL INJECTION) install. Tube, cable pulling, connection, test

User company : Phenol Plant

  1. งานลากสายและเดินท่อลมสำหรับ XV valve-Ca , pulling cable , connection , test
  2. Service Install Vibration and accessory ,steel support, junction box, Pulling cables , cable tray , test
  3. Service Install Vibration and accessory PT2 steel support, junction box, Pulling cables , cable tray , test
  4. Service for pulling cable of flow trans
  5. Service Install Rader Tx LT-14-0301 & LT-14-0401
  6. SERVICE PULLING CABLE FOR FLOW TRANSMITTER
  7. Service Install new level measurement at TK-9119
  8. Improvement interface level measurement of TK-2501 & TK-2502
  9. Service Install new level measurement at TK-9119A/B/C
  10. Service Install instrument control valve & Flow tranamitter PTTPHENOL steel support, junction box, Pulling cables , cable tray , test

User company : PTTME

  1. Elecrrical/Instrument work Nitrogen Blanketing System for Methanol Storage Tanks T-6949A/B
  2. Service Install Vibration and accessory PT2 steel support, junction box, Pulling cables , cable tray , test
  3. จ้าง Piping work (drain point)
  4. INSTRUMENT WORKS PT CAL AND TUBE CONNECT
  5. Service for pulling cable of flow trans

User company : PTTGC8

  1. Install lighting at tank farm GC8

User company : TTN

  1. 5130-10 Install teat tracing system (Additional work for SPLL area)
  2. 5130-10 Install Heat Tracing System Additional work
  3. 5130-10 Install Heat Tracing System Electrical works.
  4. 5130-10 Install Heat Tracing System Electrical works.
  5. 5130-10 Install On/Off valve limit switch FOR INSTRUMENT WORKS