Work Valume 2018

Work Experience 2018

User company : Branch 4 Aromatics I Plant (PTTGC4)

  1. Flaer line_Service for Installation Pressure transmitter for GC4
  2. Installation320-AT-39 Analyer

User company : Branch 5 Aromatic II Plant PTTGC.5

  1. Service for additional work for ETP instrument Installation for Desalter at PTTGC5 Aromatics ll
  2. Additional work electrical modification for Desalter Project at PTTGC5
  3. Service Replacement flow com 621
  4. Service Replacement flow com 611

User company : Phenol Plant (PTT PHENOL)

  1. Install redundant supply X-6201 (Phase)
  2. X-6201 Power supply improvemen (Phasel)
  3. Yearly contract_Pulling cable & install

User company : PTTGC.11 PE

  1. Instrument work
  2. Electrical Construction
  3. Add scope for Electrical Construction

User company : Techtronic/Purac(Thailand)

  1. Panel Electric Heat Tracing Electrical work
  2. Install Heat Tracing System - man power supply for stork
  3. Install Heat Tracing system additional work for ventilation
  4. Re-work Electric heat tracing project
  5. Heat tracing test inspection area scene and sdis
  6. Sirius project (EHT) verify pipe line for electric heat tracing
  7. Install heat tracing system
  8. Re-work electric heat tracing trl project
  9. Heat tracing test inspection area scene and sdis
  10. Acura Sirius project (EHT) verify pipe line for electric
  11. Install heat tracing system/li>
  12. Re-work electric heat tracing trl project
  13. Acura Sirius project (EHT) panel electric heat tracing
  14. Install heat tracing system additional work
  15. Manpower supply for G-20 Acura Sirius project (EHT)
  16. Install heat tracing system manpower supply
  17. Install new heat tracing system additional work new circuit and cable damaged

User company : BTF

  1. Install heat tracing system additional work

User company : MCO

1.  Remove & Installation including

User company : EXUS

1. Material cost lab our cost overhead&profit for comp 200C2C. PTTGC4