Work Experience 2018
User company : Branch 4 Aromatics I Plant (PTTGC4)
- Flaer line_Service for Installation Pressure transmitter for GC4
- Installation320-AT-39 Analyer
User company : Branch 5 Aromatic II Plant PTTGC.5
- Service for additional work for ETP instrument Installation for Desalter at PTTGC5 Aromatics ll
- Additional work electrical modification for Desalter Project at PTTGC5
- Service Replacement flow com 621
- Service Replacement flow com 611
User company : Phenol Plant (PTT PHENOL)
- Install redundant supply X-6201 (Phase)
- X-6201 Power supply improvemen (Phasel)
- Yearly contract_Pulling cable & install
User company : PTTGC.11 PE
- Instrument work
- Electrical Construction
- Add scope for Electrical Construction
User company : Techtronic/Purac(Thailand)
- Panel Electric Heat Tracing Electrical work
- Install Heat Tracing System - man power supply for stork
- Install Heat Tracing system additional work for ventilation
- Re-work Electric heat tracing project
- Heat tracing test inspection area scene and sdis
- Sirius project (EHT) verify pipe line for electric heat tracing
- Install heat tracing system
- Re-work electric heat tracing trl project
- Heat tracing test inspection area scene and sdis
- Acura Sirius project (EHT) verify pipe line for electric
- Install heat tracing system/li>
- Re-work electric heat tracing trl project
- Acura Sirius project (EHT) panel electric heat tracing
- Install heat tracing system additional work
- Manpower supply for G-20 Acura Sirius project (EHT)
- Install heat tracing system manpower supply
- Install new heat tracing system additional work new circuit and cable damaged
User company : BTF
- Install heat tracing system additional work
User company : MCO
1. Remove & Installation including
User company : EXUS
1. Material cost lab our cost overhead&profit for comp 200C2C. PTTGC4