Work Experience 2017
User company : Branch 4 Aromatics I Plant
- Instrument work for Hot condensate by pass pttgg4 Install. Stanchion, pulling cable ,terst
- 200-C2B_Service for installation Drain tube for GC4 , Install. Tube , pressure test,steel support
- Service for insrall moisture with cabinet for GC4 Install.stanchion ,Junction box,connection, test
- Service for Installation network cable lan com200 for GC4-Aromatics 1 pulling cable , connection , test cables
- Instrument work for Hot condensate by pass pttgg4
- 930-XC-5_Service install cable tray for GC4 - Plant 1
- Service for insrall moisture with cabinet for GC4
- Instrument Construction, URIP Improve Steam Reliability Project
- Cable Lan CAT6_Service for installation cable lan for GC4 - Aromatics 1 Plant
- 110EA-1A_Service for pulling power cable for GC4 Pulling cable , excavation , test
User company : Branch 6 Refinery
- Service for installation valve limit switch of gasoil PTTGC6 ,Install. Steel support , cable connection , test
- CCTV Installation Work, Packinox project at pttgc6 Refinery plant ,Excavation, pulling cable , install. Junction, stanchion
- Instrument Construction for LLOD-N and LLOD-S, Refinery Storm water Improvement
- Instrument Construction for Rail Truck Loading (RTL.) Refinery storm water Improvement
- Service for Instrument installation for LPG interconnecting Refinery plant
- Service for installation vale limit switch of LPG ,Refinery plant
- Electrical construction for RTL area,Refinery storm water Improvement project
- Service for Installation Pressure Transmitter at Unit 1750 Area, PTTGC6
- Service for Modify Drainage Line of Sampling System, PTTGC6
- Service for Installation Wireless Repeater at PTTGC6
- Service for Installation Cable for Flow Transmitter K-1701A/B/S at PTTGC6
- CCTV Installation Work, Packinox project at pttgc6 Refinery plant ,Excavation, pulling cable , install. Junction, stanchion
User company : Branch 5 Aromatic II Plant
- ETP Electrical & Instrument Installation Desalter Project at PTTGC5 install.stanchion , cable tray , connection ,test
- Service for additional work for ETP Electrical & Instrument installation for Desalter-Aromatics II install.stanchion , cable tray , connection ,test
- Service for installation CCTV Tower truck loading PTTGC5 ,Excavation , junction box , pole stanchion
- 2200-V7, 2940-V3 & 2200-C1 Service for installation staeam flow tranmitter for GC5 install.stanchion , cable tray , tubing, install. equipment, connection ,test
- Service for addlitional work for etp electrical & installation for desalter-aromtics ll install.stanchion , cable tray , install. equipment, connection ,test
- Service for intallation skin Temp transmitter in 2100-H1 E9 Outlet at PTTGC5 install. Equipment , cable tray , cable pulling , connection, test
- Instrument Construction for Desalter & E TP project at pttgc5 install. Equipment , cable tray , cable pulling , connection, test
- Service for control valve installation at PSA install. Equipment , cable tray , cable pulling , connection, test
- 2200-V7, 2940-V3 & 2200-C1 Service for installation staeam flow tranmitter for GC5
- Service for temp transmitter installation 2150-E1A, PTTGC5
- Service for Installation CCTV Tower Truck
- Service Install air condition for analyzer house unit 2540 for GC-5 Aromatics 2 Plant
- CCTV System modification at PTTGC5 TRUCK LOADING
- Service for installation fiber optic cable MM Truck loading area at PTTGC5
- Service for insallation instrument work LPG interconecting line project PTTGC5
- Service for Install skin Temp sensor in 2100-H1 at PTTGC5
- Service for Installation Flow Transmitte 2100-FT-040 at PTTGC5
- Electrical Modification, Desalter Projec at PTTGC5 PR REFERENCE NO 9930116611 18.1) Electrical Modification, Desalter Projec at PTTGC5 PR REFERENCE NO 9930116612
- RCU Re-WIRING Local conrrol unit55 set 2.indirect cost,safety5days,supervisor5days
- Service for new COD anslyzer 940-XC1
- Install alarm bell for GC5
- Service for temp transmitter installation 2150-E1A, PTTGC5 install. Equipment , cable tray , cable pulling , connection, test
User company : TOC Glycol
- Service remov & reinstatement work for instrument, remove equipment, connection, test
- Service for E&I for D-222 TOCGC PLANT instrument, remove equipment, connection, test
- Service E & I work ( CHEMICAL INJECTION) install. Tube, cable pulling, connection, test
User company : Phenol Plant
- งานลากสายและเดินท่อลมสำหรับ XV valve-Ca , pulling cable , connection , test
- Service Install Vibration and accessory ,steel support, junction box, Pulling cables , cable tray , test
- Service Install Vibration and accessory PT2 steel support, junction box, Pulling cables , cable tray , test
- Service for pulling cable of flow trans
- Service Install Rader Tx LT-14-0301 & LT-14-0401
- SERVICE PULLING CABLE FOR FLOW TRANSMITTER
- Service Install new level measurement at TK-9119
- Improvement interface level measurement of TK-2501 & TK-2502
- Service Install new level measurement at TK-9119A/B/C
- Service Install instrument control valve & Flow tranamitter PTTPHENOL steel support, junction box, Pulling cables , cable tray , test
User company : PTTME
- Elecrrical/Instrument work Nitrogen Blanketing System for Methanol Storage Tanks T-6949A/B
- Service Install Vibration and accessory PT2 steel support, junction box, Pulling cables , cable tray , test
- จ้าง Piping work (drain point)
- INSTRUMENT WORKS PT CAL AND TUBE CONNECT
- Service for pulling cable of flow trans
User company : PTTGC8
- Install lighting at tank farm GC8
User company : TTN
- 5130-10 Install teat tracing system (Additional work for SPLL area)
- 5130-10 Install Heat Tracing System Additional work
- 5130-10 Install Heat Tracing System Electrical works.
- 5130-10 Install Heat Tracing System Electrical works.
- 5130-10 Install On/Off valve limit switch FOR INSTRUMENT WORKS