Work Valume 2016

Work Valume 2016

User company : Branch 2 Olefins I-1 Plant

  1. Connection and Pulling Cable for DGA pulling cables
  2. จัดจ้าง Modify ระบบไฟฟ้าในBagging Area pulling cable , conduit and connection test
  3. Installation stube and bulk material Install. Tube and support sample
  4. Modify ติดตั้ง VSD สำหรับ Motor Disconnection and pulling cables
  5. Install cable & wiring for P-HD2-2015/033 Replace and cables and connection and test

User company : Branch 4 Aromatics I Plant

  1. Service for solving gavitation problem 370-LT-001 A,B,C Install. Level transmitter wiring ,pullingcable
  2. Service for install tube sampling 370-V2 Install. Tube ,pulling cable , cable tray cable connection
  3. Service install flow computer at GC4 Install. Panel , junction box, pulling cable , remove cable , cable tray wiring and connection test
  4. 200-c2a LCP Replacement service Install. Panel , replace cables , new cable , cable tray, tubes
  5. Tamp Transmitter and sensor installation steel support , cable tray , cable pulling connection test
  6. 945-TK18A Installed pikpe mx (add work from POl1040174590) for GC4-#2 Pulling cable and test
  7. Quotation install line dain 200-C-2B Install. Tube and steel support , and pressure test
  8. Service for laying power cable wast water 930-XC-5 Pulling cables , wiring and test
  9. Quotation install line dain 200-C-1 Install. Tube and steel support

User company : Branch 6 Refinery

  1. New Control Valve Installation for Heavy Gas Project Pulling cables , Connection , cable tray
  2. High Pressure Test and Concrete Work Cable Trench for Heavy Gas Project Install. Cable tray , steel support , connection and test
  3. Instrument construction work for rum & cos removal project at refinery plant Install. Cable tray , install. Junction box , excavation , pulling cable , connection and test
  4. Temp - Instrument Construction,Refinery plant Duration 1 Apr 2016-30 jun 2016 Install. Cable tray , stanchion , pulling cables , tubing , connection cables.
  5. Service for underground cable RP632,Refinery Plant Excavation cable trench , pulling cables , termination
  6. Additional works for electrical installation of MRU & COS removal project at refinery plant.Excavation cable trench , pulling cables
  7. Service for installation stanchion for wireless PTTGC6 Install.stanchion wirelless and connection
  8. Service for installation analyzer panel, PTTGC6 duration : 10 June-31 august 2016 Install.stanchion support , Pulling cable connection and test , tubing
  9. E&I T/A Construction unit 1400,100 at PTTGC6 shutdown plant , install. Steel support tubing , connection cable
  10. E&I T/A Construction unit 2400,2800,1000,4100 at PTTGC6 shutdown plant , install. Steel support tubing , connection cable
  11. E&I T/A Construction unit 1000 at PTTGC6 shutdown plant , install. Steel suport tubing , connection cable
  12. E&I T/A Construction unit 1000 at PTTGC6 shutdown plant , install. Steel support tubing , connection cable
  13. Service for Installation limit switch valve, Refinery Plant install. Steel suport , connection cable
  14. Instrument Installation service for TOPs (Hg Polisher Project.) Install. Cable tray,steel support , pulling cables , connection , tubing
  15. Service for Installation 54QIA-010, Refinery Plant, Install. Stanchion , cable tray,pulling cables
  16. Service for additional work instrument MRU PTTGC6 , Excavation , Pulling cables
  17. Service for installation instrument work LPG intcrconnceting pipe line project #2 at PTTGC5
  18. Service for Installation limit switch valve,52GB-192at PTTGC6 Install.suport , and connection cables
  19. Installation valve limit switch of gasoi 10 ppm sulfur content JETTY 1,2 PTTGC6 Install.suport , and connection cables
  20. Installation completed with supply procedure tag and tag number for sampling point PTTGC6 , supply and install. Tag label
  21. Service for Instrument Works for C4R Project PTTGC6 , Install. Cable tray , connection cables.
  22. Grounding Installation for Air Boost for VRU Project , Excavation ,pulling cables
  23. Electrical Works for MRU & COS Removal project at refinery plant. Excavation , install. Lighting , steel support , junction connection , grounding
  24. Service for electrical installation, Refinery refinery plant duration 15-2016 -30 -6-2016 Excavation , install. Lighting , steel support , junction connection , grounding
  25. Service for Electrical Installation Additional Refinery Plant (Duration :31 May2016- 1 Aug2016) Excavation , install. Lighting , steel support , junction connection , grounding
  26. Additional works for elecrrical installation of MRU & COS removal project at refinery plant. Excavation , install. Lighting , steel support , junction connection , grounding

User company : Branch 5 Aromatic II Plant

  1. Install HIM interface with DVC6200 Install. Junction box , pulling cable , install.equiptment,connection , test
  2. Replace Heated Line for CEMS 2432-AT-222 Install. Tube , stanchion , pulling cable , connection, test
  3. Install Level Switch HH with Annunciation , Pulling cable , connection
  4. Reszing Of Piping Form Tatoray Vent Gas to psa . Install. Stanchion ,cable pulling, cable tray , tube, connection
  5. Service for Instrument Construction TE4311 , Install. Stanchion ,cable pulling, cable tray , tube, connection
  6. Service for instrument work, ARO II Plant Install. Stanchion ,cable pulling, cable tray , tube, connection
  7. Installation of instrument device & Junction book for deserter-aromatics II Project.Install. Stanchion ,cable pulling, cable tray , tube, connection
  8. Service for remove nits analyzer 200 at 117 PTTGC5 Install. Stanchion ,cable pulling, cable tray , tube, connection
  9. Installation Flow Meter Line LN Install. Stanchion ,cable pulling, cable tray , tube, connection
  10. 945-TK18A Installed pike mx (add work from PO1040174590) for GC5-#2 Install. Stanchion ,cable pulling, cable tray , tube, connection
  11. ETP Instrument installation, Desalted project at PTTGC5 (AROMATICS 2 PLANT)Install. Stanchion ,junction box , equipment ,cable pulling, cable tray , tube, connection
  12. Service for installation instrument work LPG interconnecting pipe line project #2 at PTTGC5 Stanchion ,junction box , equipment ,cable pulling, cable tray , tube, connection
  13. Service for installation pressure transom 2945-TK63A,B,Project at PTTGC5 Stanchion ,junction box , equipment ,cable pulling, cable tray , tube, connection
  14. Service for installation transmitter FT2500-P13A/B e-MOC PTTGC5 Stanchion ,junction box , equipment ,cable pulling, cable tray , tube, connection
  15. Service for verify Duct Bank and open concrete cable teench and excavation for Desalter Project Excavation soil, pulling cable
  16. Service for Laying lan cable cable pulling ,connection
  17. Service for Install Crane Cable Install. Stanchion ,cable connection ,test
  18. Modify street lighting box for desalted at aromatics II project install. Lighting , connection
  19. Grounding service for desalinate and etp 2940 ground scope of work shall refer to attachment I excavation soil , cable ground , ground cad weld
  20. Service for Install LED Lighting at Truck Loading PTTGC5 Install.steel support , junction box,connection
  21. Installation of Cathodic cable for desalter project excavation soile , cad weld, test
  22. Service for Installation lighting and thank..install. Lighting and connection ,test
  23. Service for Instrument Ground Loop, Desalter Project at PTTGC5 Aro II excavation soil, cad weld , ground rod , test
  24. Repair cable manual call point desalted project PTTGC5 install. Stanchion , connection,cable pulling,test
  25. Install etp grounding 70 sq mm desalted project PTTGC5 excavation soil, cad weld , ground rod , test
  26. Grounding work, ETP Desalted Project at PTTGC5 Aromatics II excavation soil, cad weld , ground rod , test
  27. Service for laying power cable wast water 930-XC-5

User company : Branch 11 Olefins Plant 3

  1. Service for Modify tubing sampling hot water system LDPE install. Stanchion , cable pulling , connection ,test
  2. PDT Installation , Install. Stanchion , cable , test
  3. Install lighting at tank farm GC8 Install. Lighting system , pulling cable , connection , test
  4. Signal cable wiring pulling cable for L

User company : TOC Glycol

  1. Install panel wiring , Install. Equipment , connection, test

User company : Phenol Plant

  1. Cable Pulling Work , pulling cable ,connection
  2. Service order for install lighting for safety shower , install. Lighting shower , cable , conduit, connection,test
  3. Provide&puling signal cable pulling cable , connection test