Work Valume 2015
User company : Branch 6 Refinery
- Temperature seitch insstallation of inland crude unloading facilities at rail car loading terminal connection and wiring test
- PR Service Install Cable tray FAR60 Cable tray and support
- Tubing Installation for Heavy Gas Project at Refinery Install. Tubing and pressure test
- Service for Install pre-condition kit PTTGC6 refinery Install. Air condition and test
- Cable Puling and Termination Work at Sub#1 for Heavy Gas Project termination and test
- Cable Puling and Termination Work at Sub#3 for Heavy Gas Project Termination and test
- Service for Electrical Installation, PTTGC6 Refinery work chase 60 days termination and test
- Service for Underground cable for IRP632,PTTGC6 Install. Panel connection and test pump
User company : Branch 5 Aromatic II Plant
- Sevice cover protection flow comp. ptt gc5
- Installation instrument & analyzer connection and test
- Instrument work for comparably Installation for supporting 2100-E14 install. TE , PT
- Service for installation led monitor & power supply pic15a,b at pttgc5
User company : Branch 7 Jetty and Buffer Tank Farm
- Service for Change Level tank gauge LI812D
User company : Branch 8 Aromatics Tank Farm
- Service for Install foundation & cable tray Fire pump Cables and wiring
User company : Branch 11 Olefins Plant 3
- Rewiring neutral connector