Work Volume 2019

Work Volume 2019 For Reference Project


User company: Branch 4 Aromatics I Plant

  1. Laying power cable area Aromatics 1,3 for GC4-Aromatics 1 Plant
  2. Service wiring fiber-optic network
  3. Install Support-Set for 380-AT-47
  4. Vibration monitoring installation for GC4
  5. GC Anlayzer Network and Solenoid valve for GC4 PR REFERENCE NO9930122882
  6. GC Anlayzer Network and Solenoid valve for GC4 PR REFERENCE NO9930125135
  7. ลากสาย Power for GC4 PR REFERENCE
  8. Service for Electrical and Instrumen Construction work for High Tan Phase ll Project
  9. Service for 910-C1A/B/C LCP for GC4-aromatics 1 Plant

User company: Branch 5 Aromatic II Plant

  1. E&I Work for Fill Line Project at GC5,6,and 8
  2. Circuit Breaker for new DCS service for GC5
  3. Laying power cable area for Aro ll
  4. Addition work for Fill Line Project_Service for E & I

User company: บริษัท เทคโทรนิค จำกัด

  1. Install heat tracing system Manpower supply for total corbion additional CKTS DC-080 & DC-139
  2. Manpower during
  3. Material cost, Labour cost, Indirect cost for E & I

User company: EXUS GROUP CO.,LTD.

  1. Material cost, Labour cost,Overhead & Profit

User company: บริษัท ยูนิมิต เอนจิเนียริ่ง จำกัด (มหาชน)

  1. SUB-Cont, site Construction for CDR Pressure Reduction Project PTTGC6